Granite Reef Dam on the Salt River Barrier
Constructed: 1990
Classification: Waterway
Railroad iron electrodes bottom-mounted to concrete deck.
Blocks upstream migration of Colorado River striped bass and grass carp via the Central Arizona Project canal from entering headwaters of the Salt and Verde Rivers. Site currently in operation and considered 100% effective.
Gallery
Click image to enlarge.
Location: Mesa, Arizona
Site Characteristics
| Pulsators | Pulsator Qty | Power Output | Water Depth | Waterway Width | Water Velocity | Conductivity |
|---|---|---|---|---|---|---|
| 6.0kVA GFFB | 6 |
Specifications subject to change without notice.
