Lower Saint Mary Lake

Flat bar steel electrodes installed over insulated fabric layer and vertical electrodes at irrigation canal entrance.
  • Location: Babb, Montana
  • Commissioned: 2004
  • Type: Waterway

Project description

No description available.

Site characteristics

  • Pulsators: 1.5kVA POW
  • Pulsator Qty: 4