Barrier Site: San Carlos Irrigation Dist. - China Wash Project
San Carlos Irrigation Dist. - China Wash Project

Location: Florence, Arizona

Year: 1990

Barrier Type: Bottom mounted steel rail electrodes on concrete deck.

Pulsators: 6ea. - 6.0KVA GFFB

Status: Blocks upstream migration of Colorado River fish via the Central Arizona Project canal from entering the headwaters of the Gila River. This site is currently in operation and considered 100% effective.