Strawberry Reservoir and Recreation Area

Steel flat bar electrodes embedded in Insulcrete deck and side walls.
  • Location: Heber City, Utah
  • Commissioned: 1997
  • Type: Waterway

Project description

The electric barrier blocks spawning migration above a fish trap facility for trout and Kokanee. The fish are used for hatchery brood stock.

Site characteristics

  • Pulsators: 1.5kVA POW
  • Pulsator Qty: 6