San Carlos Irrigation Dist. - China Wash Project Barrier
Constructed: 1995
Classification: Waterway
Railroad iron electrodes bottom-mounted on Insulcrete deck.
Blocks upstream migration of Colorado River striped bass and grass carp via the Central Arizona Project canal from entering the headwaters of the Gila River. This site is currently in operation and considered 100% effective.
Gallery
Click image to enlarge.
Location: Florence, Arizona
Site Characteristics
| Pulsators | Pulsator Qty | Power Output | Water Depth | Waterway Width | Water Velocity | Conductivity |
|---|---|---|---|---|---|---|
| 6.0kVA GFFB | 6 |
Specifications subject to change without notice.
